U-Shape Concrete Canal — Shatt Al-Arab Water Conveyance (North Part)
Constructed a U-shape concrete canal for a distance of 4 km (Station 33+750 to 37+750) as part of conveying drinking and irrigation water to east and south Basra.

Constructed a U-shape concrete canal for a distance of 4 km (Station 33+750 to 37+750) as part of conveying drinking and irrigation water to east and south Basra.

Three transport bridges over the carrier canal including foundations, reinforced concrete structural elements, and finishing works.

Three reinforced concrete vehicle bridges including foundations, piers, beams, and deck slabs.

Two vehicle bridges including foundations, reinforced concrete structures, and finishing works.

Pump station with a discharge capacity of 7 m³/sec, including main and secondary buildings and an operator residence.

Three vehicle bridges within the northern section including foundations, reinforced concrete structures, and finishing.

Main pump station with a discharge capacity of 30 m³/sec, including primary and secondary buildings and two operator residences.

Design, execution, and maintenance of the sales center including civil, mechanical, electrical, plumbing, irrigation, hardscape, landscape, fountain, and underground pump room works. Completed in 45 days on schedule.

Design-and-build road works including civil, MEP, hardscape, landscaping, tree planting, and supply and laying of planting soil.

Backfilling, compaction, sub-base layers, and concrete foundations for walkways and children's play areas, plus curbstone installation.

Foundations, brickwork, and reinforced concrete slabs for ground and first floors with electrical, sanitary, and boundary walls, under a QA/QC system.

Civil works, internal and external finishing, electrical installations, and HVAC systems, completed within the scheduled time.

Model schools (12-class and 18-class types) including all civil, electrical, sanitary, and finishing works.

Civil, structural, electrical, and HVAC works for two electrical substation buildings under ENI supervision.

Enabling works for 100 villas and shell and core works for 67 villas (V2 Type C) in Cluster C2-1.

Repair, correction, and refurbishment works for villas V2 Type C, CYC3, TW2, Abbasy Sales Center, and the WPF3 mock-up.

Infrastructure works for the Misk Cluster covering civil works for essential site services.

Reshaping and construction of a small lake aligned with the WPF3 plots, including excavation, grading, and geometric reshaping.